A new house at the end of a long lane, a driveway that ruts and puddles every time it rains, a shared road the neighbors have been meaning to fix for years: gravel and crushed stone drives are a big part of what we do. Danny tells you straight what it needs underneath as well as on top, so the stone stays where it belongs.
Tell us what you’ve got and where the property is, and Danny will come take a look.
Prefer to talk? Call (681) 261-5698
Veteran-owned
Family-operated, based in Hedgesville, WV
WV063660
West Virginia contractor license, fully insured
Class I
West Virginia certified septic installer
Free estimates
Monday to Friday, 6am to 6pm
Why it matters
Anyone can dump a load of gravel, and for a few weeks it’ll look fine. What decides whether a driveway lasts is what’s underneath it and where the water goes. Without a solid base it sinks and ruts; without a culvert or a crown it washes its own stone into the ditch. Get the base and the water right, and the stone stays put for years.
What we build
Most driveway calls come from someone building new, someone tired of fixing the same ruts, or a few neighbors who share a road and want it done once. Some need a whole new drive, and some need what’s already there brought back. These are the jobs we do.
A new drive built from the ground up, with the base laid, the stone spread and the whole thing graded so water runs off it. It’s the right start for a new house or a new route to the barn.
Potholes, ruts, soft spots and washouts filled, compacted and topped so the drive is smooth again. Most repairs also mean fixing whatever let the water do the damage.
An old drive that’s worn down to dirt and mud, brought back with new base where it needs it, fresh stone on top and a proper grade. It’s often less than starting over, and it gets the drive back to where it should be.
Before a drive gets paved, the ground underneath has to be graded, built up and compacted. We get it ready so the paving goes down on something solid.
A pipe under the drive where it crosses a ditch or a low spot, so water passes under instead of over. It’s often the one thing that keeps a drive from washing out at the same place every storm.
Low spots built up and packed down before the stone goes on, so the drive sits level and doesn’t settle where the ground was soft.
Fresh crushed stone or gravel delivered and spread over a drive that’s thinned out, so it’s covered and even again without a bigger job.
A road that several homes use, planned with everyone who shares it and built or repaired as one job. It takes some patience to get a plan the whole group agrees on, and it’s worth it.
What to expect
A short repair and a new lane are different jobs, but most follow the same shape. Here’s what to expect.
It depends on how long and wide the drive is, how much base and stone it takes, what shape the existing drive is in and whether it needs a culvert or fill. Danny walks it with you before he puts a number on it, and the estimate is free.
Many driveway jobs take a day or a few days. A long lane or a shared road takes longer, and wet ground can move the start, since a base built on mud doesn’t hold.
Show us where the drive should run, where you’d like it wider or need room to turn around, and where the water collects. For a shared road, it helps to have the neighbors on board with the plan before work starts.
There’ll be trucks bringing stone and equipment spreading and packing it down. Getting in and out can be limited while the work is happening, and Danny will tell you ahead of time what to plan for.
A drive that’s solid, graded so the water runs off, and covered in clean stone from one end to the other. If it’s prepped for paving, it’s ready for the paving crew.
03How it works
Working with us should feel simple: you call, you deal with Danny, and you always know where things stand. When we leave, the job should look finished.
01
Tell us what you’ve got and where the property is. Builders, send the site and your timing. A photo or plan helps.
02
He looks at the ground, the water and the access, and tells you straight what the job needs. Plan on being there.
03
Sometimes a rough number on the spot, then the final one shortly after. Nothing starts until you say go.
04
With Danny on most jobs. If rain moves the day, he’ll set a new one, and the site should look finished when we’re done.
04Projects
05What customers say
Most of what people write about us comes back to Danny by name: he showed up when he said he would, told them straight, and left the job looking good.
Posted on Google![]()
Tim ChaseTrustindex verifies that the original source of the review is Google.
They did a great job with the new retaining wall. They were open and honest about what to expect and what they could do for us. I was surprised how quickly they got so much work done. Overall it was a pleasant experience and the finished product looks great.Posted on Google![]()
Michael HernandezTrustindex verifies that the original source of the review is Google.
From start to finish Mr Martin and his crew were polite, knowledgeable and honest. They work hard and provide an excellent level of expertise which made having my land cleared, driveway installed, and septic installed a seamless process. If i ever need anything done again there is only one clear choice - it would be this crew.Posted on Google![]()
chad hoffmanTrustindex verifies that the original source of the review is Google.
Danny and his team did an awesome job installing a garage pad and trailer pad on my property would highly recommend them for any projects you need donePosted on Google![]()
Colleen MarcumTrustindex verifies that the original source of the review is Google.
What a great company, fair prices, very knowledgeable, and the employees are very friendly. I will definitely use them again! 😄Posted on Google![]()
MichaelTrustindex verifies that the original source of the review is Google.
We’ve had the pleasure of working with Martin Enterprises on multiple projects, and they’ve consistently exceeded expectations. Their team is professional, reliable, and extremely skilled in all aspects of excavation work. From site prep and grading to utilities, drainage, and driveways every project has been completed on time and with exceptional attention to detail. Communication is always smooth, and they take great pride in getting things right the first time — a rare quality in this line of work. Their crews are respectful, safety-conscious, and easy to coordinate with. We trust Martin Enterprises as a key part of our building process and look forward to continuing our partnership on future projects. Highly recommended to anyone looking for a top-notch excavation contractor.Posted on Google![]()
Jen EdwardsTrustindex verifies that the original source of the review is Google.
Absolutely spectacular service! Hired to gravel our mother’s driveway. She was over the moon with their services and hired them to do tree trimming as well. The driveway is gorgeous! Excellent communication and great to work with. Would highly recommend Danny and his team!!Posted on Google![]()
Lynne HansonTrustindex verifies that the original source of the review is Google.
Martin Enterprises and Hauling did a great job of addressing our needs and went above and beyond to make sure he addressed our concerns. Our only complaint - which we discussed with Danny - was a lack of communication about not starting the project as scheduled because of rain delays. I didn’t remove a star for this because he was so attentive to the project once we got started. Overall, he’s been a pleasure to work with, his crew is respectful and dedicated to a job well done.Posted on Google![]()
Melissa BrennerTrustindex verifies that the original source of the review is Google.
Danny did an amazing job! He brought in so much dirt, regraded our yard and installed under ground rain spouts with pop up drains to keep the rain away from the foundation. Danny was honest about what needed to be done and fair with the price. He kept in constant contact with us. I would definitely recommend and use his services again in the future!Posted on Google![]()
John HobdayTrustindex verifies that the original source of the review is Google.
Great company highly recommendVerified by TrustindexTrustindex verified that these reviews were published on Martin Enterprises & Hauling's Google Business Profile. Learn more
06Where we work
Our ground work stays close to home, in Hedgesville and the towns around it. Hauling travels farther, across West Virginia, Maryland, Pennsylvania and Virginia. Don’t see your town below? Call and ask.
Hauling: West Virginia, Maryland, Pennsylvania and Virginia, in loads from 5 tons up to 20.
Questions
A driveway is something you use every day, so it’s worth asking questions before the work starts. These are the ones people usually have. If yours isn’t here, call, and Danny will give you a straight answer.
It depends on the drive. Most gravel drives do best with a coarser crushed stone underneath for the base and a smaller stone on top that packs down and drives smoothly. Danny will tell you what fits yours, based on how much traffic it gets and what the ground is like.
Often it can be fixed. If the base underneath is still mostly solid, the drive can usually be repaired or restored with new stone and better drainage. If the base is gone, it needs rebuilding, and Danny will tell you which one yours is before you spend anything.
If your drive crosses a ditch, a swale or a low spot where water runs, it usually needs one. Without it, the water goes over the drive instead of under it and takes the stone with it. If your drive meets a state road, the entrance may also need a permit, and Danny can tell you what to expect.
Yes. Shared private roads are a job we’re glad to take on. Danny can walk it with the group, explain what it needs, and work out a plan everyone can agree on before anything starts.
Most need a fresh layer every few years, more often on a busy drive or where water runs across it. A drive with a good base and good drainage needs a lot less topping up than one without.
Yes. We build up the base, grade it and pack it down so it’s solid and shaped right for paving. A good base under the paving is what keeps it from cracking and sinking later.
08Request service
Call or request service, and Danny will come take a look. Whether it’s one load of stone or a whole site, we’ll take it from here.
Monday to Friday, 6am to 6pm. Free estimates.
danny@martinshauling.com